Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FLORHAM PARK REHABILITATION AND HEALTHCARE CENTER
FLORHAM PARK, NJ · 53 certified beds · Last Life Safety survey March 12, 2026
CMS Certification Number 315530 · first certified June 2024
Ownership
Operated by MARQUIS HEALTH SERVICES · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
22 citations — more than 80% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FLORHAM PARK REHABILITATION AND HEALTHCARE CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 28, 2024 | 5 |
| November 27, 2024 | 11 |
| March 12, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2026-03-12 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-03-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-11-27 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-05-28 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-11-27 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2024-11-27 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2024-11-27 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-03-12 |
What the citations cover
- Smoke Deficiencies 12
- Egress Deficiencies 3
- Miscellaneous Deficiencies 2
- Services Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Egress Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
| Services Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 12, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (April 4, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 20, 2026) |
November 27, 2024 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (January 11, 2025) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (January 6, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 6, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 1, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 8, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (January 1, 2025) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (January 1, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 1, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (January 7, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 1, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (January 8, 2025) |
May 28, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (June 12, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 29, 2024) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (June 17, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (May 29, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.