Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BARTLEY NURSING & REHAB
JACKSON, NJ · 234 certified beds · Last Life Safety survey August 12, 2025
CMS Certification Number 315288 · first certified March 1990
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed September 16, 2022 (change of ownership)from BARTLEY HEALTHCARE INC
Position within NJ
14 citations — more than 44% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BARTLEY NURSING & REHAB
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 20, 2021 | 2 |
| April 30, 2024 | 7 |
| August 12, 2025 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2025-08-12 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-08-12 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-04-30 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-04-30 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-04-30 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2021-12-20 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-04-30 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-08-12 |
What the citations cover
- Smoke Deficiencies 10
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 12, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 10, 2025) |
April 30, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (June 13, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 14, 2024) |
December 20, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 11, 2022) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (January 17, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.