Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WILEY MISSION
MARLTON, NJ · 86 certified beds · Last Life Safety survey September 27, 2024
CMS Certification Number 315418 · first certified December 1997
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
10 citations — more than 23% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (January 2026 to June 2026). Most NJ facilities have been surveyed by October 2026. This facility’s last Life Safety survey was September 2024. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about WILEY MISSION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 23, 2021 | 1 |
| July 21, 2023 | 4 |
| September 27, 2024 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-07-21 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-09-27 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2021-11-23 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-07-21 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-07-21 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 1 | 2024-09-27 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2024-09-27 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2024-09-27 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Services Deficiencies 2
- Egress Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 27, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (October 22, 2024) |
July 21, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 2, 2023) |
November 23, 2021 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 21, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.