Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WILEY MISSION
MARLTON, NJ · 86 certified beds · Last Life Safety survey February 9, 2026
CMS Certification Number 315418 · first certified December 1997
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
18 citations — more than 61% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys on file averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was February 2026. Facilities in NJ are typically surveyed 16–19 months after the last one (median 17), measured over 464 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about WILEY MISSION
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 18 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 21, 2023 | 4 |
| September 27, 2024 | 5 |
| February 9, 2026 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-02-09 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2026-02-09 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2024-09-27 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-07-21 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-07-21 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 1 | 2024-09-27 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-07-21 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2026-02-09 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Services Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Electrical Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 9, 2026 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (March 2, 2026) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 31, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 10, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 2, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (March 2, 2026) |
| K-0901 | Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel. | Deficient, Provider has date of correction (March 25, 2026) |
| K-0902 | Meet requirements for the installation and maintenance of medical gas and medical vacuum systems. | Deficient, Provider has date of correction (March 24, 2026) |
September 27, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (October 22, 2024) |
July 21, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 2, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 2, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.