Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ATLAS REHABILITATION AND HEALTHCARE AT MAYWOOD
MAYWOOD, NJ · 120 certified beds · Last Life Safety survey August 11, 2025
CMS Certification Number 315386 · first certified December 1997
Ownership
Operated by ATLAS HEALTHCARE · For profit - Corporation
- Ownership changed December 21, 2020 (change of ownership)from YOM TOV CONVALESCENT CENTER, INC.
Position within NJ
18 citations — more than 63% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 11 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ATLAS REHABILITATION AND HEALTHCARE AT MAYWOOD
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 18 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 24, 2021 | 3 |
| April 19, 2024 | 4 |
| August 11, 2025 | 11 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2024-04-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-08-11 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2024-04-19 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 1 | 2025-08-11 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2024-04-19 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-08-11 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2025-08-11 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2025-08-11 |
What the citations cover
- Egress Deficiencies 6
- Smoke Deficiencies 5
- Emergency Preparedness Deficiencies 2
- Services Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Egress Deficiencies | 6 |
| Smoke Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 2 |
| Services Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 11, 2025 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (August 22, 2025) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 26, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 27, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 28, 2025) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (November 3, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (August 27, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 22, 2025) |
April 19, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 14, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 17, 2024) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (June 10, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (May 17, 2024) |
November 24, 2021 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (January 3, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 3, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 3, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.