Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Barnert Subacute Rehabilitation Center, Llc
PATERSON, NJ · 68 certified beds · Last Life Safety survey April 23, 2025
CMS Certification Number 315507 · first certified December 2010
Ownership
Operated by FAMILY OF CARING HEALTHCARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
9 citations — more than 18% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window is open now: August 2026 to December 2026. This facility’s last Life Safety survey was April 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Barnert Subacute Rehabilitation Center, Llc
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 10, 2021 | 0 |
| February 24, 2023 | 0 |
| April 23, 2025 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-04-23 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2025-04-23 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-04-23 |
| K-0281 | Install proper backup exit lighting. | 1 | 2025-04-23 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-04-23 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2025-04-23 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2025-04-23 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 1 | 2025-04-23 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Smoke Deficiencies 2
- Egress Deficiencies 2
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 23, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (May 7, 2025) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (May 8, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 8, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 10, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 6, 2025) |
| K-0908 | Ensure gas and vacuum systems are inspected and tested as part of a maintenance program. | Deficient, Provider has date of correction (May 19, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (June 11, 2025) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (May 7, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 8, 2025) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.