Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE GRAND REHABILITATION AND NRSG AT GUILDERLAND

ALTAMONT, NY · 127 certified beds · Last Life Safety survey March 7, 2025

CMS Certification Number 335540 · first certified September 1976

Ownership

Operated by THE GRAND HEALTHCARE · For profit - Limited Liability company

  • Ownership changed November 11, 2016 (change of ownership)to THE GRAND REHABILITATION AND NURSING AT GUILDERLAND from GUILDERLAND CENTER REHABILITATION & EXTENDED CARE FACILITY OP CO LLC
32
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within NY

32 citations — more than 94% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 21 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: August 2026 to April 2027. This facility’s last Life Safety survey was March 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE GRAND REHABILITATION AND NRSG AT GUILDERLAND

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

6 of the 32 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 32 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility32NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility32
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
42021-0872024-01212025-03
Citations at each Life Safety survey
Survey dateCitations
August 23, 20214
January 30, 20247
March 7, 202521

Most-cited tags

Most-cited tags at this facility
K-09213K-03532K-02112K-09182K-02411K-09121K-09151E-00061
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0921Ensure that testing and maintenance of electrical equipment is performed.32025-03-07
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-03-07
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-03-07
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-03-07
K-0241Have correct number of accessible exits for each story.12025-03-07
K-0912Have power receptacles that are properly grounded.12025-03-07
K-0915Have proper power supply for life support equipment.12025-03-07
E-0006Conduct risk assessment and an All-Hazards approach.12025-03-07

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 8
  • Egress Deficiencies 8
  • Emergency Preparedness Deficiencies 6
  • Smoke Deficiencies 6
  • Other 4
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies8
Egress Deficiencies8
Emergency Preparedness Deficiencies6
Smoke Deficiencies6
Services Deficiencies2
Miscellaneous Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 7, 2025 — 21 citations

Citations issued on March 7, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (April 12, 2025)
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (April 12, 2025)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (April 12, 2025)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (April 12, 2025)
E-0018Establish procedures for tracking staff and patients during an emergency.Deficient, Provider has date of correction (April 12, 2025)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (April 12, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 12, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (April 12, 2025)
K-0241Have correct number of accessible exits for each story.Deficient, Provider has date of correction (April 12, 2025)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (May 19, 2025)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (April 12, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (April 12, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (April 12, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 12, 2025)
K-0522Have an externally vented heating system.Deficient, Provider has date of correction (April 12, 2025)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (April 12, 2025)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (April 12, 2025)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (April 12, 2025)
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (April 12, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 12, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (April 12, 2025)

January 30, 2024 — 7 citations

Citations issued on January 30, 2024
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (March 22, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (April 2, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 28, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 13, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Waiver has been granted
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 30, 2024)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (April 2, 2024)

August 23, 2021 — 4 citations

Citations issued on August 23, 2021
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 8, 2021)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 8, 2021)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (October 8, 2021)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (October 8, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.