Bronx, NY · 200 certified beds · Last Life Safety survey August 26, 2025
CMS Certification Number 335486 · first certified April 1976
Ownership
Independently operated (no chain recorded by CMS) · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
11 citations — more than 34% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Pelham Parkway Nursing Care And Rehabilitation Fac
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 13, 2021 | 4 |
| June 21, 2023 | 5 |
| August 26, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-08-26 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-06-21 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2025-08-26 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-06-21 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2021-04-13 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-06-21 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2021-04-13 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2021-04-13 |
What the citations cover
- Smoke Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Construction Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 26, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (October 24, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 24, 2025) |
June 21, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 22, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 17, 2023) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (August 14, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 18, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 16, 2023) |
April 13, 2021 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 24, 2021) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 24, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 24, 2021) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (May 24, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.