Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Brooklyn-Queens Nursing Home

Brooklyn, NY · 140 certified beds · Last Life Safety survey September 10, 2024

CMS Certification Number 335637 · first certified February 1980

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within NY

17 citations — more than 65% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: March 2026 to October 2026. This facility’s last Life Safety survey was September 2024. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Brooklyn-Queens Nursing Home

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 17 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility17NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
52021-0472023-0552024-09
Citations at each Life Safety survey
Survey dateCitations
April 21, 20215
May 26, 20237
September 10, 20245

Most-cited tags

Most-cited tags at this facility
K-01612K-03451K-03511K-03741K-02311K-03211K-03711K-03411
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0161Use approved construction type or materials.22024-09-10
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12023-05-26
K-0351Install an approved automatic sprinkler system.12024-09-10
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12023-05-26
K-0231Provide large enough exits.12021-04-21
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12021-04-21
K-0371Have properly sized and located compartments to protect residents from smoke.12023-05-26
K-0341Install a fire alarm system that can be heard throughout the facility.12023-05-26

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Egress Deficiencies 4
  • Construction Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Egress Deficiencies4
Construction Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 10, 2024 — 5 citations

Citations issued on September 10, 2024
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (November 8, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (November 8, 2024)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (November 8, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 8, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (November 8, 2024)

May 26, 2023 — 7 citations

Citations issued on May 26, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Waiver has been granted (September 6, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (July 28, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (July 25, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 14, 2023)
K-0371Have properly sized and located compartments to protect residents from smoke.Deficient, Provider has date of correction (July 25, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (July 26, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 13, 2023)

April 21, 2021 — 5 citations

Citations issued on April 21, 2021
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has no plan of correction
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 15, 2021)
K-0231Provide large enough exits.Deficient, Provider has date of correction (May 15, 2021)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 15, 2021)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 15, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.