Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SLATE VALLEY CENTER FOR REHABILITATION AND NURSING

GRANVILLE, NY · 88 certified beds · Last Life Safety survey April 18, 2025

CMS Certification Number 335711 · first certified February 1990

Ownership

Operated by CENTERS HEALTH CARE · For profit - Corporation

  • Ownership changed September 1, 2017 (change of ownership)from GRANVILLE NURSING AND REHABILITATION CENTER, LLC
17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NY

17 citations — more than 65% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 11 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026. This facility’s last Life Safety survey was April 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SLATE VALLEY CENTER FOR REHABILITATION AND NURSING

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

6 of the 17 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility17NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
22019-1142022-07112025-04
Citations at each Life Safety survey
Survey dateCitations
November 25, 20192
July 29, 20224
April 18, 202511

Most-cited tags

Most-cited tags at this facility
K-09212K-02222E-00392K-07411K-03451K-02811K-09181E-00061
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0921Ensure that testing and maintenance of electrical equipment is performed.22025-04-18
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22025-04-18
E-0039Conduct testing and exercise requirements.22022-07-29
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.12022-07-29
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-04-18
K-0281Install proper backup exit lighting.12025-04-18
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-04-18
E-0006Conduct risk assessment and an All-Hazards approach.12025-04-18

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 3
  • Smoke Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies3
Smoke Deficiencies2
Miscellaneous Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 18, 2025 — 11 citations

Citations issued on April 18, 2025
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (June 22, 2025)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (June 22, 2025)
E-0029Develop a communication plan.Deficient, Provider has date of correction (June 22, 2025)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (June 22, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 22, 2025)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (June 22, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 22, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 30, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 22, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (June 22, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 22, 2025)

July 29, 2022 — 4 citations

Citations issued on July 29, 2022
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (September 27, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (August 15, 2022)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (September 27, 2022)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (September 27, 2022)

November 25, 2019 — 2 citations

Citations issued on November 25, 2019
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (December 12, 2019)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (December 12, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.