Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Lockport Rehab & Health Care Center
Lockport, NY · 82 certified beds · Last Life Safety survey March 11, 2026
CMS Certification Number 335573 · first certified January 1977
Ownership
Operated by MAXIMUS HEALTHCARE GROUP · For profit - Limited Liability company
- Ownership changed September 1, 2016 (change of ownership)to BRIODY REHAB & RESIDENTIAL HEALTH CARE CENTER from BRIODY HEALTH CARE FACILTIY LLC
Position within NY
19 citations — more than 71% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens September 2027 — about 11 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Lockport Rehab & Health Care Center
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 19 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 28, 2022 | 4 |
| June 4, 2024 | 7 |
| March 11, 2026 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2026-03-11 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2026-03-11 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-03-11 |
| E-0030 | List the names and contact information of those in the facility. | 1 | 2026-03-11 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-06-04 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-06-04 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2026-03-11 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-03-11 |
What the citations cover
- Smoke Deficiencies 12
- Emergency Preparedness Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Emergency Preparedness Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 11, 2026 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (April 24, 2026) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (April 24, 2026) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 24, 2026) |
June 4, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 2, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 2, 2024) |
June 28, 2022 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 26, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 26, 2022) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 26, 2022) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (August 26, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.