Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
THE PINES HEALTHCARE & REHAB CTRS MACHIAS CAMPUS
MACHIAS, NY · 115 certified beds · Last Life Safety survey February 3, 2025
CMS Certification Number 335578 · first certified September 1977
Ownership
Independently operated (no chain recorded by CMS) · Government - County
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
15 citations — more than 56% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to March 2027. This facility’s last Life Safety survey was February 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about THE PINES HEALTHCARE & REHAB CTRS MACHIAS CAMPUS
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 15, 2020 | 2 |
| January 27, 2023 | 4 |
| February 3, 2025 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 3 | 2025-02-03 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-02-03 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-02-03 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-02-03 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2023-01-27 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2020-01-15 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-02-03 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2025-02-03 |
What the citations cover
- Smoke Deficiencies 10
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 3, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (March 21, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 25, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (March 21, 2025) |
January 27, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 28, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 28, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 28, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (March 28, 2023) |
January 15, 2020 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (February 28, 2020) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 28, 2020) |