Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Surge Rehabilitation and Nursing LLC

Middle Island, NY · 164 certified beds · Last Life Safety survey December 22, 2025

CMS Certification Number 335390 · first certified June 1973

Ownership

Operated by PARAGON HEALTHNET · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within NY

7 citations — more than 17% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Surge Rehabilitation and Nursing LLC

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility7NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility7
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-1222024-0822025-12
Citations at each Life Safety survey
Survey dateCitations
December 6, 20223
August 9, 20242
December 22, 20252

Most-cited tags

Most-cited tags at this facility
K-03742K-03451K-02931K-01611K-01631K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.22025-12-22
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12022-12-06
K-0293Have properly located and lighted "Exit" signs.12024-08-09
K-0161Use approved construction type or materials.12022-12-06
K-0163Install noncombustible or limited-combustible interior walls.12024-08-09
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-12-22

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Construction Deficiencies 2
  • Egress Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Construction Deficiencies2
Egress Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 22, 2025 — 2 citations

Citations issued on December 22, 2025
TagWhat the surveyor checksStatus
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (January 30, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 30, 2026)

August 9, 2024 — 2 citations

Citations issued on August 9, 2024
TagWhat the surveyor checksStatus
K-0163Install noncombustible or limited-combustible interior walls.Deficient, Provider has date of correction (August 21, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (August 21, 2024)

December 6, 2022 — 3 citations

Citations issued on December 6, 2022
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (January 26, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 10, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (January 4, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.