Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Dry Harbor Nursing Home
Middle Village, NY · 360 certified beds · Last Life Safety survey April 22, 2025
CMS Certification Number 335416 · first certified June 1974
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
14 citations — more than 52% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was April 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Dry Harbor Nursing Home
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 29, 2021 | 3 |
| August 31, 2023 | 6 |
| April 22, 2025 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-08-31 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-04-22 |
| K-0912 | Have power receptacles that are properly grounded. | 2 | 2023-08-31 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-04-22 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2021-06-29 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-08-31 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-08-31 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-08-31 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 2
- Construction Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 22, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 20, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 23, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 26, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 5, 2025) |
August 31, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (October 4, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (November 7, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 7, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (October 4, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 21, 2023) |
June 29, 2021 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 27, 2021) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 27, 2021) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (August 27, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.