Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Northern Manhattan Rehabilitation and Nursing Cent
New York, NY · 320 certified beds · Last Life Safety survey December 2, 2025
CMS Certification Number 335792 · first certified January 1996
Ownership
Independently operated (no chain recorded by CMS) · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
22 citations — more than 78% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Northern Manhattan Rehabilitation and Nursing Cent
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 5, 2021 | 11 |
| December 1, 2023 | 10 |
| December 2, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-12-01 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2023-12-01 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2023-12-01 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2021-10-05 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2023-12-01 |
| K-0781 | Have restrictions on the use of portable space heaters. | 1 | 2021-10-05 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2021-10-05 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2021-10-05 |
What the citations cover
- Smoke Deficiencies 12
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Egress Deficiencies 3
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Egress Deficiencies | 3 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 2, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 19, 2025) |
December 1, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 21, 2023) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0331 | Construct fire resistant interior walls. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (December 8, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (January 26, 2024) |
October 5, 2021 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (December 2, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.