Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Waterview Hills Rehabilitation And Nursing Center

Purdy Station, NY · 130 certified beds · Last Life Safety survey October 10, 2024

CMS Certification Number 335259 · first certified July 1971

Ownership

Operated by EPIC HEALTHCARE MANAGEMENT · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

13
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NY

13 citations — more than 46% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: April 2026 to November 2026. This facility’s last Life Safety survey was October 2024. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Waterview Hills Rehabilitation And Nursing Center

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 13 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility13NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility13
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
32019-0592022-0812024-10
Citations at each Life Safety survey
Survey dateCitations
May 1, 20193
August 12, 20229
October 10, 20241

Most-cited tags

Most-cited tags at this facility
K-09232K-03241E-00391K-02241K-03511K-07121K-09211K-02221
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0923Have proper medical gas storage and administration areas.22022-08-12
K-0324Provide properly protected cooking facilities.12022-08-12
E-0039Conduct testing and exercise requirements.12022-08-12
K-0224Provide sliding doors free of hazards, operable without special knowledge or effort, and meet weight requirements to set door in motion.12022-08-12
K-0351Install an approved automatic sprinkler system.12019-05-01
K-0712Have simulated fire drills held at unexpected times.12024-10-10
K-0921Ensure that testing and maintenance of electrical equipment is performed.12022-08-12
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12019-05-01

What the citations cover

Citations by CMS category
  • Egress Deficiencies 5
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Smoke Deficiencies 2
  • Emergency Preparedness Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Egress Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies4
Smoke Deficiencies2
Emergency Preparedness Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

October 10, 2024 — 1 citation

Citations issued on October 10, 2024
TagWhat the surveyor checksStatus
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 13, 2024)

August 12, 2022 — 9 citations

Citations issued on August 12, 2022
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (September 23, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 23, 2022)
K-0224Provide sliding doors free of hazards, operable without special knowledge or effort, and meet weight requirements to set door in motion.Deficient, Provider has date of correction (September 23, 2022)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (September 23, 2022)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (September 23, 2022)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (September 23, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 23, 2022)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (September 23, 2022)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (September 23, 2022)

May 1, 2019 — 3 citations

Citations issued on May 1, 2019
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 29, 2019)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 29, 2019)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 29, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.