Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
The Osborn
Rye, NY · 84 certified beds · Last Life Safety survey February 19, 2025
CMS Certification Number 335797 · first certified August 1996
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
14 citations — more than 52% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to April 2027. This facility’s last Life Safety survey was February 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about The Osborn
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 14 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 14, 2019 | 4 |
| February 17, 2023 | 4 |
| February 19, 2025 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-02-19 |
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2025-02-19 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 1 | 2025-02-19 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-02-19 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2019-11-14 |
| K-0928 | Ensure equipment listed for use in oxygen-enriched atmospheres are correctly labeled. | 1 | 2023-02-17 |
| K-0915 | Have proper power supply for life support equipment. | 1 | 2023-02-17 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2019-11-14 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 5
- Emergency Preparedness Deficiencies 2
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 19, 2025 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 20, 2025) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (April 20, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 20, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 20, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 20, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 20, 2025) |
February 17, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0928 | Ensure equipment listed for use in oxygen-enriched atmospheres are correctly labeled. | Deficient, Provider has date of correction (April 14, 2023) |
November 14, 2019 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (February 5, 2020) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 5, 2020) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (February 5, 2020) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 5, 2020) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.