Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Sea View Hospital Rehabilitation Center and Home
Staten Island, NY · 304 certified beds · Last Life Safety survey April 23, 2025
CMS Certification Number 335108 · first certified July 1970
Ownership
Operated by NEW YORK CITY HEALTH + HOSPITALS · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
10 citations — more than 29% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was April 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Sea View Hospital Rehabilitation Center and Home
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 31, 2020 | 5 |
| February 9, 2023 | 4 |
| April 23, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 2 | 2025-04-23 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-02-09 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2020-01-31 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2020-01-31 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2020-01-31 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-02-09 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-02-09 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-02-09 |
What the citations cover
- Smoke Deficiencies 7
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 23, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (June 20, 2025) |
February 9, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 15, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 28, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 15, 2023) |
January 31, 2020 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (March 31, 2020) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (March 31, 2020) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (March 31, 2020) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 31, 2020) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (March 31, 2020) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.