Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Maplewood Nursing Home Inc

Webster, NY · 74 certified beds · Last Life Safety survey May 23, 2025

CMS Certification Number 335572 · first certified November 1976

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within NY

9 citations — more than 25% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was May 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Maplewood Nursing Home Inc

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations on file over three years

Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.

This facility9NY median13National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in NY13
Median facility nationally11

Survey history

Citations at each Life Safety survey
42022-0622024-0332025-05
Citations at each Life Safety survey
Survey dateCitations
June 3, 20224
March 13, 20242
May 23, 20253

Most-cited tags

Most-cited tags at this facility
K-09183K-09212K-03721K-03211K-03631K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.32025-05-23
K-0921Ensure that testing and maintenance of electrical equipment is performed.22025-05-23
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-03-13
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-06-03
K-0363Install corridor and hallway doors that block smoke.12022-06-03
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-05-23

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Smoke Deficiencies 4
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies5
Smoke Deficiencies4

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 23, 2025 — 3 citations

Citations issued on May 23, 2025
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 15, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 15, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (July 15, 2025)

March 13, 2024 — 2 citations

Citations issued on March 13, 2024
TagWhat the surveyor checksStatus
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 11, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 10, 2024)

June 3, 2022 — 4 citations

Citations issued on June 3, 2022
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 9, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (August 9, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 9, 2022)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (August 9, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.