Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Excel At Woodbury for Rehabilitation and Nursing,
Woodbury, NY · 123 certified beds · Last Life Safety survey July 22, 2025
CMS Certification Number 335231 · first certified April 1968
Ownership
Operated by PARAGON HEALTHNET · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
10 citations — more than 29% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was July 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Excel At Woodbury for Rehabilitation and Nursing,
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
2 of the 10 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 22, 2022 | 8 |
| April 23, 2024 | 1 |
| July 22, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-04-23 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2022-09-22 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2022-09-22 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2025-07-22 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2022-09-22 |
| K-0915 | Have proper power supply for life support equipment. | 1 | 2022-09-22 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2022-09-22 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2022-09-22 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Emergency Preparedness Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 22, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 10, 2025) |
April 23, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 21, 2024) |
September 22, 2022 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (October 20, 2022) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (September 23, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 23, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 23, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 23, 2022) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (November 17, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 23, 2022) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 23, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.