Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GREEN VILLAGE SKILLED NURSING & REHABILITATION LTD
AKRON, OH · 69 certified beds · Last Life Safety survey April 28, 2025
CMS Certification Number 366425 · first certified February 2015
Ownership
Operated by VRC MANAGEMENT · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
7 citations — more than 10% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was April 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GREEN VILLAGE SKILLED NURSING & REHABILITATION LTD
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 31, 2019 | 2 |
| October 13, 2022 | 1 |
| April 28, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2025-04-28 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-04-28 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-04-28 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2019-10-31 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2019-10-31 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2025-04-28 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2022-10-13 |
What the citations cover
- Egress Deficiencies 2
- Smoke Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 2 |
| Smoke Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 28, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (May 30, 2025) |
October 13, 2022 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 25, 2022) |
October 31, 2019 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (November 15, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 15, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.