Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Chardon Woods
CHARDON, OH · 161 certified beds · Last Life Safety survey May 19, 2025
CMS Certification Number 365800 · first certified August 1990
Ownership
Operated by JOURNEY HEALTHCARE · For profit - Corporation
- New ownershipOwnership changed December 30, 2024 (change of ownership)from MUNSON HEALTHCARE, INC.
Position within OH
29 citations — more than 85% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 9.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 3 months from now. This facility’s last Life Safety survey was May 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Chardon Woods
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 29 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 29 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 21, 2019 | 8 |
| October 6, 2022 | 12 |
| January 16, 2025 | 8 |
| May 19, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 3 | 2025-01-16 |
| K-0915 | Have proper power supply for life support equipment. | 2 | 2022-10-06 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-01-16 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-01-16 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2025-01-16 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-01-16 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2025-01-16 |
| K-0930 | Ensure proper storage of liquid oxygen. | 1 | 2019-11-21 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Egress Deficiencies 6
- Services Deficiencies 5
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Egress Deficiencies | 6 |
| Services Deficiencies | 5 |
| Miscellaneous Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 19, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (June 11, 2025) |
January 16, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 19, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 19, 2025) |
October 6, 2022 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (October 28, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 28, 2022) |
November 21, 2019 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0371 | Have properly sized and located compartments to protect residents from smoke. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (January 17, 2020) |
| K-0915 | Have proper power supply for life support equipment. | Waiver has been granted (June 30, 2020) |
| K-0930 | Ensure proper storage of liquid oxygen. | Deficient, Provider has date of correction (January 17, 2020) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.