Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HOME AT HEARTHSTONE, THE
CINCINNATI, OH · 96 certified beds · Last Life Safety survey July 25, 2024
CMS Certification Number 366251 · first certified December 2002
Ownership
Operated by FOUNDATIONS HEALTH SOLUTIONS · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
25 citations — more than 77% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: March 2026 to March 2027. This facility’s last Life Safety survey was July 2024. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about HOME AT HEARTHSTONE, THE
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 25 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 28, 2019 | 5 |
| February 3, 2022 | 15 |
| July 25, 2024 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-07-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-07-25 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2024-07-25 |
| E-0031 | Provide emergency officials' contact information. | 1 | 2022-02-03 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2024-07-25 |
| E-0036 | Establish emergency prep training and testing. | 1 | 2022-02-03 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2022-02-03 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2022-02-03 |
What the citations cover
- Smoke Deficiencies 10
- Emergency Preparedness Deficiencies 6
- Services Deficiencies 3
- Egress Deficiencies 3
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Emergency Preparedness Deficiencies | 6 |
| Services Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 25, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (August 16, 2024) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (August 16, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 16, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 16, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 16, 2024) |
February 3, 2022 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (March 4, 2022) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (March 4, 2022) |
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (March 4, 2022) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (March 4, 2022) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (March 4, 2022) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 4, 2022) |
March 28, 2019 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 1, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 1, 2019) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 1, 2019) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (May 1, 2019) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (May 1, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.