Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ALGART HEALTH CARE
CLEVELAND, OH · 78 certified beds · Last Life Safety survey September 22, 2025
CMS Certification Number 366308 · first certified February 2005
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
22 citations — more than 71% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 12 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was September 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ALGART HEALTH CARE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 18, 2019 | 8 |
| October 6, 2022 | 2 |
| September 22, 2025 | 12 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2025-09-22 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-09-22 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-09-22 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-09-22 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-09-22 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2019-10-18 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2019-10-18 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2025-09-22 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Miscellaneous Deficiencies 4
- Egress Deficiencies 3
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Miscellaneous Deficiencies | 4 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 22, 2025 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 2, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (October 2, 2025) |
October 6, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 19, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 19, 2022) |
October 18, 2019 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (November 30, 2019) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 30, 2019) |