Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WESTPARK HEALTHCARE CAMPUS
CLEVELAND, OH · 99 certified beds · Last Life Safety survey January 29, 2026
CMS Certification Number 365796 · first certified July 1990
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
28 citations — more than 83% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens September 2027 — about 12 months from now. This facility’s last Life Safety survey was January 2026. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about WESTPARK HEALTHCARE CAMPUS
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 28 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 28 Life Safety citations above. The Physical Environment Index
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 28 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 7, 2019 | 13 |
| March 27, 2023 | 8 |
| January 29, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2026-01-29 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2026-01-29 |
| K-0923 | Have proper medical gas storage and administration areas. | 2 | 2023-03-27 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2026-01-29 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2023-03-27 |
| E-0025 | Create arrangements with other facilities to receive patients. | 1 | 2019-11-07 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2023-03-27 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2026-01-29 |
What the citations cover
- Smoke Deficiencies 10
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Emergency Preparedness Deficiencies 3
- Egress Deficiencies 3
- Other 5
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Emergency Preparedness Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
| Construction Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 29, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (March 20, 2026) |
March 27, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 12, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 12, 2023) |
November 7, 2019 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has plan of correction (December 13, 2019) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has plan of correction (December 13, 2019) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has plan of correction (December 13, 2019) |
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 20, 2019) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 20, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.