Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
STILLWATER SKILLED NURSING AND REHABILITATION
COVINGTON, OH · 75 certified beds · Last Life Safety survey April 16, 2026
CMS Certification Number 365483 · first certified April 1980
Ownership
Operated by MICHAEL SLYK · For profit - Limited Liability company
- Ownership changed December 1, 2018 (change of ownership)from CC SNF, LLC
Position within OH
15 citations — more than 44% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2027 — about 14 months from now. This facility’s last Life Safety survey was April 2026. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about STILLWATER SKILLED NURSING AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 3, 2019 | 5 |
| March 24, 2023 | 7 |
| April 16, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-04-16 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2026-04-16 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-04-16 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 2 | 2023-03-24 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2019-10-03 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2023-03-24 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-03-24 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2019-10-03 |
What the citations cover
- Smoke Deficiencies 10
- Services Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Services Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 16, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 14, 2026) |
March 24, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (April 26, 2023) |
October 3, 2019 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (November 29, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 29, 2019) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (November 29, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (November 29, 2019) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (November 29, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.