Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CRESTLINE REHABILITATION AND NURSING CENTER
CRESTLINE, OH · 30 certified beds · Last Life Safety survey June 18, 2025
CMS Certification Number 366002 · first certified June 1995
Ownership
Operated by NORTHWOOD HEALTHCARE GROUP · For profit - Corporation
- Ownership changed September 18, 2017 (change of ownership)from CRESTLINE FACILTY OPERATIONS, LLC
Position within OH
16 citations — more than 49% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was June 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CRESTLINE REHABILITATION AND NURSING CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 16 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 22, 2019 | 5 |
| August 25, 2022 | 9 |
| June 18, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | 3 | 2025-06-18 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 3 | 2025-06-18 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2022-08-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2022-08-25 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2019-08-22 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2022-08-25 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2022-08-25 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2022-08-25 |
What the citations cover
- Egress Deficiencies 9
- Smoke Deficiencies 3
- Services Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 9 |
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 18, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (August 14, 2025) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (August 14, 2025) |
August 25, 2022 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Fire Safety Evaluation Survey (September 30, 2022) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Fire Safety Evaluation Survey (September 30, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 30, 2022) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (September 30, 2022) |
August 22, 2019 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Fire Safety Evaluation Survey (September 30, 2019) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Fire Safety Evaluation Survey (September 30, 2019) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 30, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.