Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

GREENBRIAR NURSING CENTER

EATON, OH · 74 certified beds · Last Life Safety survey February 27, 2025

CMS Certification Number 365854 · first certified November 1991

Ownership

Operated by LIONSTONE CARE · For profit - Corporation

  • Ownership changed June 28, 2024 (change of ownership)from OCTOBER ENTERPRISES, INC.
13
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within OH

13 citations — more than 36% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was February 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about GREENBRIAR NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 13 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.

This facility13OH median16National median11
Citations on file over three years, compared
MeasureCitations
This facility13
Median facility in OH16
Median facility nationally11

Survey history

Citations at each Life Safety survey
42019-0362022-0432025-02
Citations at each Life Safety survey
Survey dateCitations
March 21, 20194
April 11, 20226
February 27, 20253

Most-cited tags

Most-cited tags at this facility
K-03532K-02931K-03211K-02321E-00041K-07121K-03721K-09121
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22022-04-11
K-0293Have properly located and lighted "Exit" signs.12019-03-21
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-04-11
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.12022-04-11
E-0004Develop and maintain an Emergency Preparedness Program (EP).12025-02-27
K-0712Have simulated fire drills held at unexpected times.12019-03-21
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12019-03-21
K-0912Have power receptacles that are properly grounded.12022-04-11

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Egress Deficiencies 2
  • Emergency Preparedness Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies2
Egress Deficiencies2
Emergency Preparedness Deficiencies2
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 27, 2025 — 3 citations

Citations issued on February 27, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (March 14, 2025)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (March 14, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 14, 2025)

April 11, 2022 — 6 citations

Citations issued on April 11, 2022
TagWhat the surveyor checksStatus
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (May 3, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 3, 2022)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 3, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 3, 2022)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (May 3, 2022)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (May 3, 2022)

March 21, 2019 — 4 citations

Citations issued on March 21, 2019
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 3, 2019)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 3, 2019)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 3, 2019)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 3, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.