Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GREENBRIAR NURSING CENTER
EATON, OH · 74 certified beds · Last Life Safety survey February 27, 2025
CMS Certification Number 365854 · first certified November 1991
Ownership
Operated by LIONSTONE CARE · For profit - Corporation
- Ownership changed June 28, 2024 (change of ownership)from OCTOBER ENTERPRISES, INC.
Position within OH
13 citations — more than 36% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was February 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GREENBRIAR NURSING CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 13 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 13 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 21, 2019 | 4 |
| April 11, 2022 | 6 |
| February 27, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2022-04-11 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2019-03-21 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2022-04-11 |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | 1 | 2022-04-11 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2025-02-27 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2019-03-21 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2019-03-21 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2022-04-11 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 2
- Emergency Preparedness Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 27, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (March 14, 2025) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (March 14, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 14, 2025) |
April 11, 2022 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (May 3, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 3, 2022) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (May 3, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 3, 2022) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (May 3, 2022) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 3, 2022) |
March 21, 2019 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 3, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 3, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 3, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 3, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.