Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MOMENTOUS HEALTH AT SIDNEY
SIDNEY, OH · 51 certified beds · Last Life Safety survey April 20, 2026
CMS Certification Number 366033 · first certified November 1995
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed May 1, 2022 (change of ownership)from FHS SIDNEY INC
Position within OH
18 citations — more than 57% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 4.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2027 — about 14 months from now. This facility’s last Life Safety survey was April 2026. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MOMENTOUS HEALTH AT SIDNEY
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 9, 2019 | 2 |
| February 24, 2022 | 2 |
| October 17, 2024 | 10 |
| April 20, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 4 | 2026-04-20 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-04-20 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-04-20 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-10-17 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2024-10-17 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-10-17 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-10-17 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2024-10-17 |
What the citations cover
- Smoke Deficiencies 10
- Miscellaneous Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Miscellaneous Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 20, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 8, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 8, 2026) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (May 8, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 8, 2026) |
October 17, 2024 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (December 16, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 16, 2024) |
February 24, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 10, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (March 10, 2022) |
May 9, 2019 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 28, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 28, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.