Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Chickasha Nursing Center, Inc

Chickasha, OK · 60 certified beds · Last Life Safety survey September 6, 2024

CMS Certification Number 375541 · first certified December 2010

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within OK

17 citations — more than 93% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (October 2025 to January 2026), and past the point by which nine in ten OK facilities have been surveyed. This facility’s last Life Safety survey was September 2024. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Chickasha Nursing Center, Inc

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 17 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.

This facility17OK median8National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in OK8
Median facility nationally11

Survey history

Citations at each Life Safety survey
132022-0822023-0822024-09
Citations at each Life Safety survey
Survey dateCitations
August 25, 202213
August 10, 20232
September 6, 20242

Most-cited tags

Most-cited tags at this facility
K-07122K-05212K-03532K-02931K-09121K-03621E-00391K-09231
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.22023-08-10
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.22024-09-06
K-0353Inspect, test, and maintain automatic sprinkler systems.22023-08-10
K-0293Have properly located and lighted "Exit" signs.12022-08-25
K-0912Have power receptacles that are properly grounded.12024-09-06
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.12022-08-25
E-0039Conduct testing and exercise requirements.12022-08-25
K-0923Have proper medical gas storage and administration areas.12022-08-25

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Miscellaneous Deficiencies 4
  • Services Deficiencies 3
  • Egress Deficiencies 3
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Miscellaneous Deficiencies4
Services Deficiencies3
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 6, 2024 — 2 citations

Citations issued on September 6, 2024
TagWhat the surveyor checksStatus
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (October 31, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (December 3, 2024)

August 10, 2023 — 2 citations

Citations issued on August 10, 2023
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 20, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 20, 2024)

August 25, 2022 — 13 citations

Citations issued on August 25, 2022
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (October 19, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (October 19, 2022)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (October 7, 2022)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 7, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 19, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 7, 2022)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (October 7, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (October 7, 2022)
K-0522Have an externally vented heating system.Deficient, Provider has date of correction (October 7, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 7, 2022)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (October 7, 2022)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (October 7, 2022)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 7, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.