Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CIMARRON NURSING CENTER

KINGFISHER, OK · 92 certified beds · Last Life Safety survey February 5, 2025

CMS Certification Number 375102 · first certified December 1989

Ownership

Operated by BGM ESTATE · For profit - Corporation

  • Ownership changed August 1, 2019 (change of ownership)from CITY OF PAULS VALLEY
6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within OK

6 citations — more than 35% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (March 2026 to June 2026). Most OK facilities have been surveyed by October 2026. This facility’s last Life Safety survey was February 2025. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CIMARRON NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations on file over three years

Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.

This facility6OK median8National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in OK8
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-1212023-1122025-02
Citations at each Life Safety survey
Survey dateCitations
December 2, 20223
November 16, 20231
February 5, 20252

Most-cited tags

Most-cited tags at this facility
K-07122K-09182K-03211K-03631
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.22025-02-05
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-02-05
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-12-02
K-0363Install corridor and hallway doors that block smoke.12022-12-02

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Miscellaneous Deficiencies 2
  • Smoke Deficiencies 2
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies2
Miscellaneous Deficiencies2
Smoke Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 5, 2025 — 2 citations

Citations issued on February 5, 2025
TagWhat the surveyor checksStatus
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 17, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has plan of correction (March 17, 2025)

November 16, 2023 — 1 citation

Citations issued on November 16, 2023
TagWhat the surveyor checksStatus
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 14, 2024)

December 2, 2022 — 3 citations

Citations issued on December 2, 2022
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (December 31, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 31, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 31, 2022)