Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MANGUM SKILLED NURSING AND THERAPY

MANGUM, OK · 140 certified beds · Last Life Safety survey December 4, 2024

CMS Certification Number 375207 · first certified January 1995

Ownership

Operated by BRIDGES HEALTH · For profit - Partnership

  • Ownership changed July 1, 2019 (change of ownership)from CITY OF PAULS VALLEY
13
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within OK

13 citations — more than 81% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (January 2026 to April 2026), and past the point by which nine in ten OK facilities have been surveyed. This facility’s last Life Safety survey was December 2024. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MANGUM SKILLED NURSING AND THERAPY

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations on file over three years

Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.

This facility13OK median8National median11
Citations on file over three years, compared
MeasureCitations
This facility13
Median facility in OK8
Median facility nationally11

Survey history

Citations at each Life Safety survey
52022-0542023-0942024-12
Citations at each Life Safety survey
Survey dateCitations
May 12, 20225
September 8, 20234
December 4, 20244

Most-cited tags

Most-cited tags at this facility
K-03243K-03212K-02911K-02931K-03511K-03621K-03531K-07611
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0324Provide properly protected cooking facilities.32024-12-04
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22023-09-08
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-12-04
K-0293Have properly located and lighted "Exit" signs.12024-12-04
K-0351Install an approved automatic sprinkler system.12022-05-12
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.12022-05-12
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-09-08
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12023-09-08

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Egress Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Egress Deficiencies2
Miscellaneous Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 4, 2024 — 4 citations

Citations issued on December 4, 2024
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (February 4, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (February 4, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (February 4, 2025)
K-0344Have an alternate power supply for its alarm system.Deficient, Provider has date of correction (February 4, 2025)

September 8, 2023 — 4 citations

Citations issued on September 8, 2023
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 25, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (April 3, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 3, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (April 3, 2024)

May 12, 2022 — 5 citations

Citations issued on May 12, 2022
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 15, 2022)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 15, 2022)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 15, 2022)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (June 15, 2022)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 15, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.