Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CALLAWAY NURSING HOME
SULPHUR, OK · 86 certified beds · Last Life Safety survey April 28, 2025
CMS Certification Number 37E624 · first certified October 2015
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OK
28 citations — more than 100% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (June 2026 to September 2026). Most OK facilities have been surveyed by December 2026. This facility’s last Life Safety survey was April 2025. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CALLAWAY NURSING HOME
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 28 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 28 |
| Median facility in OK | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 8, 2022 | 8 |
| January 5, 2024 | 11 |
| April 28, 2025 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 3 | 2025-04-28 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 3 | 2025-04-28 |
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2025-04-28 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2025-04-28 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-04-28 |
| K-0912 | Have power receptacles that are properly grounded. | 2 | 2025-04-28 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2025-04-28 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 2 | 2024-01-05 |
What the citations cover
- Smoke Deficiencies 11
- Miscellaneous Deficiencies 6
- Egress Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Miscellaneous Deficiencies | 6 |
| Egress Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 28, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (June 25, 2025) |
January 5, 2024 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (May 20, 2024) |
December 8, 2022 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 13, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 26, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (January 13, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 13, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (January 13, 2023) |
| K-0522 | Have an externally vented heating system. | Deficient, Provider has date of correction (January 23, 2023) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (January 13, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 13, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.