Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
REEDWOOD POST ACUTE
PORTLAND, OR · 64 certified beds · Last Life Safety survey June 26, 2025
CMS Certification Number 385055 · first certified January 1967
Ownership
Operated by PACS GROUP · For profit - Corporation
- Ownership changed September 1, 2024 (change of ownership)to CRESTON SNF HEALTHCARE LLC from CARE CENTER REEDWOOD INC
Position within OR
8 citations — more than 22% of the 128 certified nursing homes in OR. Compared within OR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was June 2025. Facilities in OR are typically surveyed 15–17 months after the last one (median 16), measured over 188 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about REEDWOOD POST ACUTE
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 8 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OR, and nationally. Surveyors differ markedly between states, so the OR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in OR | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 5, 2022 | 1 |
| March 7, 2024 | 5 |
| June 26, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-06-26 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-03-07 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2022-12-05 |
| K-0281 | Install proper backup exit lighting. | 1 | 2025-06-26 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-03-07 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-03-07 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2024-03-07 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2024-03-07 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Smoke Deficiencies 3
- Emergency Preparedness Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Smoke Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 26, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (June 30, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 1, 2025) |
March 7, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (April 3, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 26, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 3, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 3, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 3, 2024) |
December 5, 2022 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 2, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.