Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
NAAMANS CREEK COUNTRY MANOR
BOOTHWYN, PA · 90 certified beds · Last Life Safety survey June 26, 2026
CMS Certification Number 395952 · first certified May 1995
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PA
9 citations — more than 43% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was June 2026. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about NAAMANS CREEK COUNTRY MANOR
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in PA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 17, 2024 | 5 |
| May 2, 2025 | 3 |
| June 26, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 2 | 2026-06-26 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2025-05-02 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-05-17 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-05-17 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-05-17 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-05-17 |
| K-0100 | Meet other general requirements. | 1 | 2024-05-17 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-05-02 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Egress Deficiencies 1
- Services Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 26, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has plan of correction (July 31, 2026) |
May 2, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (June 9, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 9, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 9, 2025) |
May 17, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 30, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.