Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Crosslands
KENNETT SQUARE, PA · 60 certified beds · Last Life Safety survey January 9, 2025
CMS Certification Number 395388 · first certified September 1977
Ownership
Operated by KENDAL · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PA
4 citations — more than 22% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (November 2025 to January 2026), and past the point by which nine in ten PA facilities have been surveyed. This facility’s last Life Safety survey was January 2025. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Crosslands
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 4 |
| Median facility in PA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 27, 2023 | 1 |
| December 28, 2023 | 3 |
| January 9, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | 1 | 2023-01-27 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-12-28 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-12-28 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-12-28 |
What the citations cover
- Smoke Deficiencies 2
- Construction Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 28, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 30, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 30, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 30, 2023) |
January 27, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | Deficient, Provider has date of correction (February 17, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.