Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Kendal At Longwood

KENNETT SQUARE, PA · 53 certified beds · Last Life Safety survey September 5, 2025

CMS Certification Number 395307 · first certified October 1973

Ownership

Operated by KENDAL · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within PA

6 citations — more than 29% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (July 2026 to September 2026). Most PA facilities have been surveyed by October 2026. This facility’s last Life Safety survey was September 2025. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Kendal At Longwood

One email when it happens. No account; stop it any time with one click.

Which alerts

How that compares

Citations on file over three years

Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.

This facility6PA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in PA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
22023-1042024-0902025-09
Citations at each Life Safety survey
Survey dateCitations
October 5, 20232
September 5, 20244
September 5, 20250

Most-cited tags

Most-cited tags at this facility
K-05211K-03741K-03211K-01331K-02911K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.12024-09-05
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12023-10-05
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12024-09-05
K-0133Install a two-hour-resistant firewall separation.12023-10-05
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-09-05
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-09-05

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Services Deficiencies 1
  • Egress Deficiencies 1
  • Construction Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Services Deficiencies1
Egress Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 5, 2024 — 4 citations

Citations issued on September 5, 2024
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (September 19, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 19, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 19, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (September 19, 2024)

October 5, 2023 — 2 citations

Citations issued on October 5, 2023
TagWhat the surveyor checksStatus
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (November 17, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (November 17, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.