Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SOUDERTON MENNONITE HOMES

SOUDERTON, PA · 71 certified beds · Last Life Safety survey April 1, 2026

CMS Certification Number 395634 · first certified April 1984

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
1
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within PA

7 citations — more than 36% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 4 citations; the earlier surveys on file averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 3 months from now. This facility’s last Life Safety survey was April 2026. Facilities in PA are typically surveyed 11–12 months after the last one (median 11), measured over 1,101 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about SOUDERTON MENNONITE HOMES

One email when it happens. No account; stop it any time with one click.

Which alerts

How that compares

Citations in CMS's current file

Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.

This facility7PA median10National median11
Citations in CMS's current file, compared
MeasureCitations
This facility7
Median facility in PA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
02024-0432025-0342026-04
Citations at each Life Safety survey
Survey dateCitations
April 4, 20240
March 20, 20253
April 1, 20264

Most-cited tags

Most-cited tags at this facility
K-01332K-09111K-09231K-03721K-09201K-03511
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0133Install a two-hour-resistant firewall separation.22026-04-01
K-0911Meet requirements for the installation and maintenance of electrical systems.12025-03-20
K-0923Have proper medical gas storage and administration areas.12026-04-01
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-04-01
K-0920Ensure proper usage of power strips and extension cords.12025-03-20
K-0351Install an approved automatic sprinkler system.12026-04-01

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Smoke Deficiencies 2
  • Construction Deficiencies 2
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies3
Smoke Deficiencies2
Construction Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 1, 2026 — 4 citations

Citations issued on April 1, 2026
TagWhat the surveyor checksStatus
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (May 27, 2026)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (May 27, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 27, 2026)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (May 27, 2026)

March 20, 2025 — 3 citations

Citations issued on March 20, 2025
TagWhat the surveyor checksStatus
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (May 1, 2025)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (May 1, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 1, 2025)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.