Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SERVICIOS INTEGRADOS DE REHABILITACION (SIRO) INC
HORMIGUEROS, PR · 20 certified beds · Last Life Safety survey March 11, 2026
CMS Certification Number 405029 · first certified July 2006
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PR
25 citations — more than 50% of the 9 certified nursing homes in PR. Compared within PR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 11. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. PR has too few recent surveys to measure on its own, so the national interval is used.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SERVICIOS INTEGRADOS DE REHABILITACION (SIRO) INC
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index
- F-0908 Keep all essential equipment working safely.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
How that compares
Compared with the median facility in PR, and nationally. Surveyors differ markedly between states, so the PR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 25 |
| Median facility in PR | 25 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 23, 2024 | 15 |
| April 29, 2025 | 7 |
| March 11, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-04-29 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2025-04-29 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-03-11 |
| E-0009 | Include a process for Emergency Preparedness collaboration. | 2 | 2025-04-29 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2025-04-29 |
| E-0024 | Establish policies and procedures for volunteers. | 2 | 2025-04-29 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2024-04-23 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2025-04-29 |
What the citations cover
- Smoke Deficiencies 8
- Egress Deficiencies 8
- Emergency Preparedness Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Egress Deficiencies | 8 |
| Emergency Preparedness Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 11, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 8, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 8, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 8, 2026) |
April 29, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (April 7, 2025) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (April 7, 2025) |
| E-0034 | Provide a means of sharing information on occupancy/needs. | Deficient, Provider has date of correction (April 7, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 7, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 26, 2025) |
April 23, 2024 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (April 19, 2024) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (April 19, 2024) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (April 19, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (March 15, 2024) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (April 15, 2024) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (April 15, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (March 15, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 15, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 15, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 15, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 10, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 8, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (March 15, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 1, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 15, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.