Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

The Dawn Hill Home for Rehab and Healthcare

Bristol, RI · 133 certified beds · Last Life Safety survey June 4, 2026

CMS Certification Number 415050 · first certified February 1977

Ownership

Operated by GREEN TREE HEALTHCARE MANAGEMENT · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within RI

10 citations — more than 76% of the 72 certified nursing homes in RI. Compared within RI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was June 2026. Facilities in RI are typically surveyed 11–14 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about The Dawn Hill Home for Rehab and Healthcare

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in RI, and nationally. Surveyors differ markedly between states, so the RI figure is the meaningful one.

This facility10RI median4National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in RI4
Median facility nationally11

Survey history

Citations at each Life Safety survey
72024-0122024-1212026-06
Citations at each Life Safety survey
Survey dateCitations
January 22, 20247
December 19, 20242
June 4, 20261

Most-cited tags

Most-cited tags at this facility
K-09182K-03512K-02911K-03451K-02931K-03531K-03001K-02221
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-06-04
K-0351Install an approved automatic sprinkler system.22024-12-19
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-01-22
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12024-01-22
K-0293Have properly located and lighted "Exit" signs.12024-01-22
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-01-22
K-0300Meet other general requirements that are deficient.12024-01-22
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12024-12-19

What the citations cover

Citations by CMS category
  • Egress Deficiencies 4
  • Smoke Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
Citations by CMS category
CategoryCitations
Egress Deficiencies4
Smoke Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 4, 2026 — 1 citation

Citations issued on June 4, 2026
TagWhat the surveyor checksStatus
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 30, 2026)

December 19, 2024 — 2 citations

Citations issued on December 19, 2024
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (January 18, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (January 18, 2025)

January 22, 2024 — 7 citations

Citations issued on January 22, 2024
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (February 13, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (February 13, 2024)
K-0300Meet other general requirements that are deficient.Deficient, Provider has date of correction (February 13, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 13, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (February 13, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 13, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 13, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.