Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Mansion Nursing and Rehab Center

Central Falls, RI · 62 certified beds · Last Life Safety survey July 18, 2025

CMS Certification Number 415097 · first certified April 1991

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

14
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within RI

14 citations — more than 90% of the 72 certified nursing homes in RI. Compared within RI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (July 2026 to September 2026). Most RI facilities have been surveyed by October 2026. This facility’s last Life Safety survey was July 2025. Facilities in RI are typically surveyed 11–14 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Mansion Nursing and Rehab Center

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in RI, and nationally. Surveyors differ markedly between states, so the RI figure is the meaningful one.

This facility14RI median4National median11
Citations on file over three years, compared
MeasureCitations
This facility14
Median facility in RI4
Median facility nationally11

Survey history

Citations at each Life Safety survey
42023-0752024-0752025-07
Citations at each Life Safety survey
Survey dateCitations
July 21, 20234
July 5, 20245
July 18, 20255

Most-cited tags

Most-cited tags at this facility
K-02323K-01613K-02523K-09201K-03511K-07121K-02221K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.32025-07-18
K-0161Use approved construction type or materials.32025-07-18
K-0252Provide at least two remote exits on each floor or fire section of the building.32025-07-18
K-0920Ensure proper usage of power strips and extension cords.12025-07-18
K-0351Install an approved automatic sprinkler system.12024-07-05
K-0712Have simulated fire drills held at unexpected times.12023-07-21
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12024-07-05
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-07-18

What the citations cover

Citations by CMS category
  • Egress Deficiencies 7
  • Construction Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Egress Deficiencies7
Construction Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Miscellaneous Deficiencies1
Smoke Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 18, 2025 — 5 citations

Citations issued on July 18, 2025
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Past Non-Compliance (July 14, 2025)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Past Non-Compliance (July 14, 2025)
K-0252Provide at least two remote exits on each floor or fire section of the building.Past Non-Compliance (July 14, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 17, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 17, 2025)

July 5, 2024 — 5 citations

Citations issued on July 5, 2024
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Past Non-Compliance (June 24, 2017)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (July 26, 2024)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Past Non-Compliance (June 24, 2017)
K-0252Provide at least two remote exits on each floor or fire section of the building.Past Non-Compliance (June 24, 2017)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (July 26, 2024)

July 21, 2023 — 4 citations

Citations issued on July 21, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (August 20, 2023)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (August 20, 2023)
K-0252Provide at least two remote exits on each floor or fire section of the building.Deficient, Provider has date of correction (August 20, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 20, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.