Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Prince George Healthcare Center

Georgetown, SC · 148 certified beds · Last Life Safety survey June 10, 2025

CMS Certification Number 425295 · first certified November 1990

Ownership

Operated by FUNDAMENTAL HEALTHCARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

3
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
0
Inspection & testing records
Of the citations on file

Position within SC

3 citations — more than 69% of the 187 certified nursing homes in SC. Compared within SC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

When is the next survey likely?

The window is open now: July 2026 to March 2027. This facility’s last Life Safety survey was June 2025. Facilities in SC are typically surveyed 13–21 months after the last one (median 15), measured over 286 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Prince George Healthcare Center

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 3 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in SC, and nationally. Surveyors differ markedly between states, so the SC figure is the meaningful one.

This facility3SC median1National median11
Citations on file over three years, compared
MeasureCitations
This facility3
Median facility in SC1
Median facility nationally11

Survey history

Citations at each Life Safety survey
02021-0832023-1002025-06
Citations at each Life Safety survey
Survey dateCitations
August 18, 20210
October 6, 20233
June 10, 20250

Most-cited tags

Most-cited tags at this facility
K-02231E-00151K-09191
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12023-10-06
E-0015Address subsistence needs for staff and patients.12023-10-06
K-0919Meet requirements for the use of electrical equipment.12023-10-06

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Egress Deficiencies 1
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies1
Egress Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

October 6, 2023 — 3 citations

Citations issued on October 6, 2023
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (October 20, 2023)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (October 10, 2023)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (October 4, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.