Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Patewood Post Acute
Greenville, SC · 120 certified beds · Last Life Safety survey May 21, 2026
CMS Certification Number 425305 · first certified February 1991
Ownership
Operated by PACS GROUP · For profit - Limited Liability company
- Ownership changed September 1, 2021 (change of ownership)from SC - GA2018 PATEWOOD REHABILITATION AND HEALTHCARE CENTER, LLC
Position within SC
2 citations — more than 63% of the 187 certified nursing homes in SC. Compared within SC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was May 2026. Facilities in SC are typically surveyed 13–21 months after the last one (median 15), measured over 286 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Patewood Post Acute
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 2 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in SC, and nationally. Surveyors differ markedly between states, so the SC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 2 |
| Median facility in SC | 1 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 2, 2023 | 2 |
| April 8, 2025 | 0 |
| May 21, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-06-02 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2023-06-02 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 2, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 15, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (June 15, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.