Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CHURCH HILL POST-ACUTE AND REHABILITATION CENTER
CHURCH HILL, TN · 124 certified beds · Last Life Safety survey February 12, 2026
CMS Certification Number 445237 · first certified September 1989
Ownership
Operated by PLAINVIEW HEALTHCARE PARTNERS · For profit - Limited Liability company
- Ownership changed June 1, 2021 (change of ownership)from VANGUARD OF CHURCH HILL, LLC
Position within TN
4 citations — more than 19% of the 303 certified nursing homes in TN. Compared within TN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was February 2026. Facilities in TN are typically surveyed 15–44 months after the last one (median 33), measured over 279 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CHURCH HILL POST-ACUTE AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 4 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TN, and nationally. Surveyors differ markedly between states, so the TN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 4 |
| Median facility in TN | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 13, 2021 | 0 |
| November 18, 2024 | 2 |
| February 12, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-02-12 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2026-02-12 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-11-18 |
What the citations cover
- Smoke Deficiencies 3
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 12, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 24, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 24, 2026) |
November 18, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 22, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.