Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
JEFFERSON CITY HEALTH AND REHAB CENTER
JEFFERSON CITY, TN · 170 certified beds · Last Life Safety survey November 2, 2023
CMS Certification Number 445246 · first certified March 1990
Ownership
Operated by PRESTIGE ADMINISTRATIVE SERVICES · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TN
2 citations — more than 7% of the 303 certified nursing homes in TN. Compared within TN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: January 2025 to July 2027. This facility’s last Life Safety survey was November 2023. Facilities in TN are typically surveyed 15–44 months after the last one (median 33), measured over 279 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about JEFFERSON CITY HEALTH AND REHAB CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 2 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in TN, and nationally. Surveyors differ markedly between states, so the TN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 2 |
| Median facility in TN | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 21, 2019 | 1 |
| March 4, 2020 | 0 |
| November 2, 2023 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-11-02 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2019-02-21 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 2, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 30, 2023) |
February 21, 2019 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (March 30, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.