Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HARDIN HOME
SAVANNAH, TN · 39 certified beds · Last Life Safety survey June 10, 2025
CMS Certification Number 44E166 · first certified July 1980
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TN
6 citations — more than 35% of the 303 certified nursing homes in TN. Compared within TN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to February 2029. This facility’s last Life Safety survey was June 2025. Facilities in TN are typically surveyed 15–44 months after the last one (median 33), measured over 279 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about HARDIN HOME
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 6 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
How that compares
Compared with the median facility in TN, and nationally. Surveyors differ markedly between states, so the TN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in TN | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 9, 2021 | 0 |
| August 14, 2024 | 3 |
| June 10, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-06-10 |
| E-0009 | Include a process for Emergency Preparedness collaboration. | 1 | 2024-08-14 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-08-14 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-06-10 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2025-06-10 |
What the citations cover
- Emergency Preparedness Deficiencies 2
- Smoke Deficiencies 2
- Egress Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 2 |
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (July 22, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 22, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 22, 2025) |
August 14, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (September 27, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 6, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 27, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.