Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Windsor Nursing and Rehabilitation Center of Bastr
Bastrop, TX · 96 certified beds · Last Life Safety survey September 10, 2026
CMS Certification Number 675356 · first certified June 1994
Ownership
Operated by WELLSENTIAL HEALTH · For profit - Limited Liability company
- Ownership changed March 31, 2017 (change of ownership)to WINDSOR NURSING AND REHABILITATION CENTER OF BASTROP from SSC BASTROP OPERATING COMPANY LLC
Position within TX
3 citations — more than 14% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens October 2027 — about 11 months from now. This facility’s last Life Safety survey was September 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,923 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Windsor Nursing and Rehabilitation Center of Bastr
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 3 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 11, 2024 | 0 |
| July 17, 2025 | 3 |
| September 10, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2025-07-17 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2025-07-17 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2025-07-17 |
What the citations cover
- Services Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 17, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Past Non-Compliance (July 24, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (August 11, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Past Non-Compliance (July 24, 2025) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.