Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PECAN BAYOU NURSING AND REHABILITATION
BROWNWOOD, TX · 90 certified beds · Last Life Safety survey August 27, 2025
CMS Certification Number 676278 · first certified April 2011
Ownership
Operated by HMG HEALTHCARE · For profit - Corporation
- Ownership changed October 1, 2021 (change of ownership)from BROWNWOOD SCC LLC
Position within TX
7 citations — more than 44% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was August 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PECAN BAYOU NURSING AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 24, 2023 | 5 |
| July 26, 2024 | 0 |
| August 27, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2023-05-24 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 1 | 2023-05-24 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-08-27 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-05-24 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-05-24 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-05-24 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-08-27 |
What the citations cover
- Smoke Deficiencies 5
- Services Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 27, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 12, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 12, 2025) |
May 24, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (July 21, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 21, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 21, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 21, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 21, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.