Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MESA VIEW SENIOR LIVING
CANADIAN, TX · 48 certified beds · Last Life Safety survey December 5, 2025
CMS Certification Number 45F603 · first certified January 2008
Ownership
Independently operated (no chain recorded by CMS) · Government - Hospital district
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TX
5 citations — more than 28% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was December 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MESA VIEW SENIOR LIVING
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 16, 2023 | 2 |
| December 12, 2024 | 0 |
| December 5, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-11-16 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-12-05 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-11-16 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-12-05 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-12-05 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 5, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 6, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 6, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 6, 2025) |
November 16, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 15, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.