Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
THE BRIGHTPOINTE
CONROE, TX · 150 certified beds · Last Life Safety survey July 9, 2025
CMS Certification Number 676420 · first certified February 2017
Ownership
Operated by PUREHEALTH · For profit - Corporation
- Ownership changed July 1, 2022 (change of ownership)from THE RIO AT CONROE, LLC
Position within TX
16 citations — more than 88% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (August 2026 to September 2026). Most TX facilities have been surveyed by October 2026. This facility’s last Life Safety survey was July 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about THE BRIGHTPOINTE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 16 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 9, 2023 | 5 |
| May 30, 2024 | 3 |
| July 9, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-07-09 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-05-30 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2023-03-09 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-07-09 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-03-09 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2025-07-09 |
| E-0025 | Create arrangements with other facilities to receive patients. | 1 | 2025-07-09 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-07-09 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Emergency Preparedness Deficiencies 2
- Egress Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 9, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (July 12, 2025) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 12, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (July 12, 2025) |
May 30, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 1, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 1, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 17, 2024) |
March 9, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 7, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.