Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WINDSOR NURSING AND REHABILITATION CENTER OF HARLI
HARLINGEN, TX · 154 certified beds · Last Life Safety survey August 12, 2026
CMS Certification Number 455822 · first certified June 1989
Ownership
Operated by WELLSENTIAL HEALTH · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TX
5 citations — more than 27% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys on file averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens September 2027 — about 10 months from now. This facility’s last Life Safety survey was August 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,923 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about WINDSOR NURSING AND REHABILITATION CENTER OF HARLI
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 19, 2024 | 1 |
| June 12, 2025 | 0 |
| August 12, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2026-08-12 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2026-08-12 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-04-19 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-08-12 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-08-12 |
What the citations cover
- Smoke Deficiencies 4
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 12, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 14, 2026) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (August 14, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 14, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 14, 2026) |
April 19, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 18, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.